
The library will be closed March 13 and 14. If you are scheduled to work either day, please note that the library is closed and have a great day off!!!
"The contractor has issued a shut down notice to turn off the water to the DuBois Library in order to install a new fire protection system in the telecom switchroom. In addition they are moving some conduit and other pipe/valve/connection work relating to the water service to the building. Once the work has been completed they must flush the water system with a treatment and then test the water to be sure the treatment fluids are out. This requires a 24 hr. lab test. The timing of this is such that it has been decided the building will be closed Saturday-Sunday and will re-open on Monday, March 15th at 8AM. "
"The contractor has issued a shut down notice to turn off the water to the DuBois Library in order to install a new fire protection system in the telecom switchroom. In addition they are moving some conduit and other pipe/valve/connection work relating to the water service to the building. Once the work has been completed they must flush the water system with a treatment and then test the water to be sure the treatment fluids are out. This requires a 24 hr. lab test. The timing of this is such that it has been decided the building will be closed Saturday-Sunday and will re-open on Monday, March 15th at 8AM. "
0 Comments:
Post a Comment
<< Home