LC Desk Daily

An interactive blog for student staff to not only learn about library updates and policies affecting the LC desk, but also information and techno literacy. Your comments are crucial!!

Friday, February 26, 2010


The library will be closed March 13 and 14. If you are scheduled to work either day, please note that the library is closed and have a great day off!!!

"
The contractor has issued a shut down notice to turn off the water to the DuBois Library in order to install a new fire protection system in the telecom switchroom. In addition they are moving some conduit and other pipe/valve/connection work relating to the water service to the building. Once the work has been completed they must flush the water system with a treatment and then test the water to be sure the treatment fluids are out. This requires a 24 hr. lab test. The timing of this is such that it has been decided the building will be closed Saturday-Sunday and will re-open on Monday, March 15th at 8AM. "




0 Comments:

Post a Comment

<< Home